United States · US dollars · price per yard and square foot
Concrete Slab Cost Calculator
Slab size and your prices
Results
Ordered yards, the costs you entered, and a separate bag comparison.
Slab cost from your prices
Material cost uses ordered yards. Delivery and labor are added only when you enter them. A blank price is left out. Type 0 when that charge is free.
- Ordered yards
- Not calculated
- Ready-mix material cost
- Not calculated
- Delivery or short-load fee
- Not calculated
- Labor
- Not calculated
- Total of entered costs
- Not calculated
- Cost per square foot
- Not calculated
Area and volume
Area is the slab you measured. Volume with allowance adds the waste percent once. Ordered yards round up only when you enter a supplier increment.
- Area
- Not calculated
- Length used
- Not calculated
- Width used
- Not calculated
- Thickness used
- Not calculated
- Volume before waste (cubic yards)
- Not calculated
- Volume before waste (cubic feet)
- Not calculated
- Waste allowance
- Not calculated
- Volume after waste (cubic yards)
- Not calculated
- Volume after waste (cubic feet)
- Not calculated
- Ordered yards after the supplier increment
- Not calculated
How the dollars were added
- Ready-mix price per cubic yard
- Not calculated
- Ready-mix material cost
- Not calculated
- Unrounded material estimate
- Not calculated
- Delivery or short-load fee
- Not calculated
- Labor rate per square foot
- Not calculated
- Labor
- Not calculated
- Total of entered costs
- Not calculated
- Cost per square foot
- Not calculated
Bagged alternative
These counts use the cubic feet with allowance, not the rounded yard order. The bag cost is a comparison. It is not included in the total above. Yields are for QUIKRETE Concrete Mix, Product 1101.
- 80 lb yield
- Not calculated
- 80 lb theoretical bags
- Not calculated
- 80 lb bags to buy
- Not calculated
- 80 lb bag cost
- Not calculated
- 60 lb yield
- Not calculated
- 60 lb theoretical bags
- Not calculated
- 60 lb bags to buy
- Not calculated
- 60 lb bag cost
- Not calculated
How this result was figured
Area, yards, and the costs you entered appear here after you calculate.
Estimate what a rectangular concrete slab costs from the ready-mix price, delivery fee, and labor rate you were quoted. Waste starts at 10% and is added once to the concrete volume. For the same slab in cubic yards and 40, 60, and 80 lb bags, without prices, use the concrete slab calculator. For a volume you already know, use the concrete bag calculator.
How much does a concrete slab cost?
Multiply length by width by thickness in feet, then divide by 27 to get cubic yards. The waste percent is added once. Ordered yards round up to your supplier increment when you type one. Ready-mix cost is those yards times your price. Delivery and labor are added only from amounts you enter. Bag counts use the cubic feet with allowance.
How do I use this concrete slab cost calculator?
Enter the slab size, a waste percent, and the prices from your own quotes.
- Measure length and width in feet and inches, and the concrete thickness in inches.
- Leave waste at 10%, or type a percent from 0 to 20. It is added once. Blank keeps 10%.
- Type the ready-mix price per cubic yard you were quoted. Delivery, a supplier increment, labor per square foot, and bag prices are optional. Leave a price blank when you do not know it, or type 0 when it really is zero.
- Choose Calculate. Ordered yards round up only when you enter an increment. The total adds the dollar amounts you entered. Bag counts stay a separate comparison.
How is slab cost calculated?
The page multiplies the slab you measured, adds one waste percent, then applies only the dollar amounts you type. It does not look up a plant price.
- Area, in square feet, is length times width after inches are converted to feet. Labor uses this area.
- Base volume, in cubic feet, is area times thickness in feet. Four inches is 4 ÷ 12, or 1/3 foot. Cubic yards are cubic feet divided by 27.
- Volume with allowance equals the base volume times (1 + waste ÷ 100). The percent is added once. At the 10% default, multiply by 1.10.
- Ordered yards equal that volume. If you type a supplier increment, such as 0.25 or 0.5 cubic yards, the order rounds up to the next step. Material cost is ordered yards times your price per cubic yard.
- The unrounded material estimate is the volume with allowance, before that rounding, times the same price. It is a comparison, not the purchasing total.
- Delivery, including a short-load fee, stays separate. Labor is the rate per square foot times the area. The total adds whichever of those amounts you entered. Cost per square foot is the total divided by the area.
- Bag counts divide the cubic feet with allowance by the bag yield, then round up. An 80 lb bag of QUIKRETE Concrete Mix, Product 1101, yields about 0.60 cubic feet. A 60 lb bag yields about 0.45. Bag cost is not added on top of the ready-mix total.
A blank price means that part is unknown. Zero is a real price of $0.00. If this volume already includes the allowance, do not add that same percent again on the concrete materials calculator.
What does a 20 by 20 foot slab at 4 inches cost in the example?
With 10% waste added once, a 20 foot by 20 foot slab at 4 inches is 146.6667 cubic feet, or 5.4321 cubic yards, before a supplier rounds the order. The prices below are example placeholders. Replace them with local quotes. They are not a national average.
20 ft × 20 ft × 4 in, 10% waste, example prices
- Area is 20 × 20 = 400 square feet. Labor uses this area. Waste does not change it.
- Four inches is 4 ÷ 12 = 1/3 foot.
- Base volume is 400 × 1/3 = 400/3 cubic feet, shown as 133.3333. That is 4.9383 cubic yards before any allowance.
- 10% is added once: (400/3) × 1.10 = 440/3 cubic feet, shown as 146.6667, or 5.4321 cubic yards.
- A 0.25 cubic yard increment rounds 5.4321 up to 5.50 ordered yards. At the example $150 per cubic yard, material cost is 5.50 × 150 = $825.00. The unrounded comparison is about $814.81.
- The example delivery fee is $75. It stays separate from the price per yard.
- Example labor is $3 per square foot × 400 = $1,200.00.
- The total of those example amounts is $825.00 + $75.00 + $1,200.00 = $2,100.00. Cost per square foot is $2,100.00 ÷ 400 = $5.25.
- An 80 lb bag yields about 0.60 cubic feet, so (440/3) ÷ 0.60 = 244.4444, which rounds up to 245 bags. At the example $6.50, that comparison is $1,592.50. It is not added to the $2,100.00.
- A 60 lb bag yields about 0.45 cubic feet, so (440/3) ÷ 0.45 = 325.9259, which rounds up to 326 bags. At the example $5.00, that comparison is $1,630.00.
| Item | Example result |
|---|---|
| Area | 400 sq ft |
| Volume before waste | 4.9383 yd³ |
| Volume after 10% waste | 5.4321 yd³ |
| Ordered yards at 0.25 | 5.50 yd³ |
| Ready-mix material at $150 | $825.00 |
| Delivery placeholder | $75.00 |
| Labor at $3 per sq ft | $1,200.00 |
| Total | $2,100.00 |
| Cost per square foot | $5.25 |
| 80 lb bags at $6.50 | 245 bags, $1,592.50 |
| 60 lb bags at $5.00 | 326 bags, $1,630.00 |
The button fills those entries and calculates. Change any number afterward, or choose Reset. The same 4 inch thickness on a 10 by 10 foot slab, at 10% waste, is 1.3580 cubic yards and matches the bag calculator: 62 of the 80 lb bags and 82 of the 60 lb bags.
What changes the price of a concrete slab?
The concrete volume and the quotes you type are what move the total. A thicker slab, a short-load fee, a coarser order step, reinforcement you pay for separately, and labor each do a different job.
- Thickness scales the volume. Six inches is 1.5 times a 4 inch slab of the same area, before waste. The 20 by 20 foot example at 6 inches and 10% waste is 8.1481 cubic yards before rounding, and a 0.25 yard step orders 8.25 yards. At the example $150, material cost is $1,237.50 instead of $825.00. This page does not choose 4 inches or 6 inches. Patios are often planned near 4 inches and driveways near 5 to 6 inches. For a driveway order, including a flared apron, use the concrete driveway calculator. For a patio, including a circle or an L-shape, use the concrete patio calculator. Check the local code and a qualified professional.
- Delivery minimums and short-load fees are set by the plant, not by this page. A small order can cost more per yard because the plant charges a fee under its own minimum, or a flat delivery charge on the load. Type that fee in the delivery box. If the price per yard already includes delivery, type 0 so the fee is not added twice.
- A supplier increment rounds the order up. The 20 by 20 foot example needs 5.4321 yards after waste and pays for 5.50 if the plant sells in 0.25 yard steps. That extra concrete is the order step, not a second waste percent. Leave the increment blank when you want the cost of the exact volume with allowance.
- Reinforcement is not subtracted from the volume, and it is not a line in the total. Rebar and wire mesh can add cost. If the labor quote already includes placing mesh, that money is inside the rate you type. This page does not design bar size, spacing, or a slab joint.
- Labor and finishing are per square foot of area when that is how you were quoted. A broom finish and a more involved finish are different rates you type. The rate is not multiplied by the waste percent, because waste is extra concrete, not extra slab area. Forms, grading, and gravel base are included only if you put them in that rate or add them yourself outside this total.
When is ready-mix cheaper than bags?
Ready-mix is sold by the cubic yard, plus any delivery or short-load fee you enter. Bags are sold by the bag, and someone has to mix them. The concrete volume is the same either way. Compare the two totals on this page with your own prices. Do not add them together.
In the 20 by 20 foot example, ready-mix material is $825.00 for 5.50 ordered yards, plus the $75.00 delivery placeholder. The 80 lb comparison is 245 bags and $1,592.50 at $6.50 a bag, before the time to mix them. Those dollar figures are placeholders. A local bag price or a higher short-load fee can reverse which one is lower.
Bags fit a small placement. One cubic yard is 27 cubic feet, or 45 of the 80 lb bags before waste, and 50 bags with the 10% default. Above about 1 cubic yard, mixing bags is a long job, which is why the bag calculator notes that a ready-mix quote may be worth asking for. A 10 by 10 foot slab at 4 inches with 10% is already 1.3580 cubic yards. The slab calculator shows the same yards and also counts a 40 lb bag.
A plant will still ask for a strength, often in psi, and details such as slump. This page does not choose a psi. The bag label lists its own strength. Read the bag you buy, because another brand can list a different yield than the 0.60 and 0.45 cubic feet used here.
What do people ask about slab cost?
How is a concrete slab cost calculated?
Area is length times width. Volume in cubic feet is that area times thickness in feet. Cubic yards are cubic feet divided by 27. Waste is added once. If you enter a supplier increment, ordered yards round up to that step, and the ready-mix material cost uses those ordered yards. Delivery and labor are amounts you type. The total adds the amounts you entered. Cost per square foot is that total divided by the area.
Are the prices on this page a national average?
No. Every dollar amount is a number you type. The worked example uses placeholders such as $150 per cubic yard so the arithmetic is easy to follow. Replace them with a quote from a local plant, the delivery fee from that plant, and labor from the contractor you hire. This page does not look up prices.
What is a short-load or delivery fee?
Some plants charge extra when an order is smaller than their own minimum, or they charge a delivery fee on top of the price per yard. Type that fee in the delivery box. It stays separate from the price per cubic yard. Type 0 if the quote already includes delivery and there is no extra fee. Leave it blank if you do not know it yet. This page does not know the minimum a plant sets.
Does reinforcement change the concrete volume?
Rebar and wire mesh are not subtracted from the volume, and this page does not price them. They can add cost that is not in the total unless you fold that cost into the labor rate you type. Thickness does change volume: 6 inches is 1.5 times a 4 inch slab of the same area, before waste and before a supplier increment.
How do ready-mix and bagged concrete compare?
Ready-mix is sold by the cubic yard, plus any delivery or short-load fee you enter. Bag counts divide the cubic feet with allowance by about 0.60 for an 80 lb bag or about 0.45 for a 60 lb bag of QUIKRETE Concrete Mix, Product 1101, then round up. Bag cost is whole bags times the price you type. It is an alternative, not an amount added on top of the ready-mix total. The bag page also counts a 40 lb bag. This page does not.
Is the waste percent added twice?
No. Base volume is length times width times thickness. Order volume equals that base times (1 + percent / 100). Ordered yards, bag counts, and the ready-mix material cost use that order volume. Labor uses the slab area and does not add the waste percent again. Blank waste keeps the 10% default. Type 0 when you want no extra concrete.
What does this cost calculator leave to you?
It estimates quantity and the dollars from prices you type. Thickness, strength, reinforcement, and a code check stay with you or a qualified professional.
- Results are planning estimates. They are not a bid, a mix design, or a structural design.
- Every price is a number you enter. The worked example uses placeholders. They are not a national average and not a quote.
- Waste is 0 to 20 and is added once. Blank means the 10% default. Type 0 for no extra concrete. Labor does not use that percent.
- Bag yields are approximate published yields for one premixed product, in 60 and 80 lb bags. They are not cement-only bags, and they are not every brand.
- Each side is limited to 10,000 feet. Prices are limited to $1,000,000. A supplier increment must be from 0.01 to 1,000 cubic yards.
- The ordered amount is not a promise that a plant will deliver that fraction of a yard or waive a short-load fee.
The disclaimer states the same limit for every calculator on this site.