United States · feet and inches · cubic yards
Concrete Patio Calculator
Patio size and your prices
Results
Square feet, cubic yards to order, the costs you entered, and a separate bag comparison.
Patio order from your prices
Material cost uses ordered yards. Delivery and labor are added only when you enter them. A blank price is left out. Type 0 when that charge is free.
- Ordered yards
- Not calculated
- Ready-mix material cost
- Not calculated
- Delivery or short-load fee
- Not calculated
- Labor
- Not calculated
- Total of entered costs
- Not calculated
- Cost per square foot
- Not calculated
Area and volume
Area is what you measured, including a second rectangle when you entered one. Volume with allowance adds the waste percent once. Ordered yards round up only when you enter a supplier increment.
- Total area
- Not calculated
- Shape
- Not calculated
- Main patio
- Not calculated
- Second section
- Not calculated
- Length used
- Not calculated
- Width used
- Not calculated
- Diameter used
- Not calculated
- Thickness used
- Not calculated
- Volume before waste (cubic yards)
- Not calculated
- Volume before waste (cubic feet)
- Not calculated
- Waste allowance
- Not calculated
- Volume after waste (cubic yards)
- Not calculated
- Volume after waste (cubic feet)
- Not calculated
- Ordered yards after the supplier increment
- Not calculated
How the dollars were added
- Ready-mix price per cubic yard
- Not calculated
- Ready-mix material cost
- Not calculated
- Unrounded material estimate
- Not calculated
- Delivery or short-load fee
- Not calculated
- Labor rate per square foot
- Not calculated
- Labor
- Not calculated
- Total of entered costs
- Not calculated
- Cost per square foot
- Not calculated
Bagged alternative
These counts use the cubic feet with allowance, not the rounded yard order. The bag cost is a comparison. It is not included in the total above. Yields are for QUIKRETE Concrete Mix, Product 1101.
- 40 lb yield
- Not calculated
- 40 lb theoretical bags
- Not calculated
- 40 lb bags to buy
- Not calculated
- 40 lb bag cost
- Not calculated
- 60 lb yield
- Not calculated
- 60 lb theoretical bags
- Not calculated
- 60 lb bags to buy
- Not calculated
- 60 lb bag cost
- Not calculated
- 80 lb yield
- Not calculated
- 80 lb theoretical bags
- Not calculated
- 80 lb bags to buy
- Not calculated
- 80 lb bag cost
- Not calculated
How this result was figured
Square feet, cubic yards, bag counts, and the costs you entered appear here after you calculate.
Estimate how much concrete a patio needs, in square feet, cubic yards, and cubic feet, before you order ready-mix or bags. Choose a rectangle or a circle, and add a second rectangle when the patio is an L. Thickness starts at 4 inches. Waste starts at 10% and is added once. For a plain rectangle without a second section, use the concrete slab calculator. For a driveway, including a flared apron, use the concrete driveway calculator. For a volume you already know, use the concrete bag calculator. For a footing, column, wall, or steps, use the home calculator.
How much concrete does a patio need?
Multiply length by width by thickness in feet, then divide by 27 for cubic yards. A circle uses pi times the radius squared times thickness. Add a second rectangle for an L-shape, then add the waste percent once. Ordered yards round up to a supplier increment when you type one. Bag counts use the cubic feet with that allowance.
How do I use this concrete patio calculator?
Enter the patio shape and size, any second rectangle, a waste percent, and the prices from your own quotes.
- Choose a rectangle or a circle. Measure length and width, or the diameter, in feet and inches, and the concrete thickness in inches. Thickness starts at 4 inches.
- Leave the second section blank if the patio is one shape. If you fill any box in that section, fill length, width, and thickness. The two rectangles of an L must not overlap.
- Leave waste at 10%, or type a percent from 0 to 20. It is added once. Blank keeps 10%.
- Type a ready-mix price, delivery or short-load fee, supplier increment, labor per square foot, and bag prices only when you have them. Choose Calculate. Bag counts stay a separate comparison.
How is patio concrete calculated?
The page adds the parts you measured, adds one waste percent, then applies only the dollar amounts you type. It does not look up a plant price, and it does not choose a thickness.
- A rectangle, in square feet, is length times width after inches are converted to feet.
- A circle is pi times the radius squared. The radius is half the diameter. Measure straight across the center, not around the rim.
- A second rectangle, such as the other leg of an L, is length times width and is added. The two rectangles must not share the corner. Leave the section blank when you do not have one.
- Base volume, in cubic feet, is each area times its own thickness in feet. Four inches is 4 ÷ 12, or 1/3 foot. Cubic yards are cubic feet divided by 27.
- Volume with allowance equals the combined base volume times (1 + waste ÷ 100). The percent is added once. At the 10% default, multiply by 1.10.
- Ordered yards equal that volume. If you type a supplier increment, such as 0.25 or 0.5 cubic yards, the order rounds up to the next step. Material cost is ordered yards times your price per cubic yard.
- The unrounded material estimate is the volume with allowance, before that rounding, times the same price. It is a comparison, not the purchasing total.
- Delivery, including a short-load fee, stays separate. Labor is the rate per square foot times the measured area, including a second rectangle. The total adds whichever of those amounts you entered. Cost per square foot is the total divided by that area.
- Bag counts divide the cubic feet with allowance by the bag yield, then round up. A 40 lb bag of QUIKRETE Concrete Mix, Product 1101, yields about 0.30 cubic feet. A 60 lb bag yields about 0.45. An 80 lb bag yields about 0.60. Bag cost is not added on top of the ready-mix total.
A blank price means that part is unknown. Zero is a real price of $0.00. A blank thickness on the main patio keeps 4 inches. If this volume already includes the allowance, do not add that same percent again on the concrete materials calculator.
How many yards is a 12 by 12 foot patio?
With 10% waste added once, a 12 foot by 12 foot patio at 4 inches is 52.8 cubic feet, or 1.9556 cubic yards, before a supplier rounds the order. The prices below are example placeholders. Replace them with local quotes. They are not a national average.
12 ft × 12 ft × 4 in, 10% waste
- Area is 12 × 12 = 144 square feet. Four inches is 4 ÷ 12 = 1/3 foot.
- Base volume is 144 × 1/3 = 48 cubic feet, or 48 ÷ 27 = 1.7778 cubic yards, before any allowance.
- Labor uses this 144 square feet. Waste does not change the area.
- 10% is added once: 48 × 1.10 = 52.8 cubic feet, or 1.9556 cubic yards.
- A 0.25 cubic yard increment rounds 1.9556 up to 2 ordered yards. At the example $150 per cubic yard, material cost is 2 × 150 = $300.00. The unrounded comparison is $293.33.
- The example delivery fee is $75. It stays separate from the price per yard.
- Example labor is $3 per square foot × 144 = $432.00.
- The total of those example amounts is $300.00 + $75.00 + $432.00 = $807.00. Cost per square foot is $807.00 ÷ 144 = $5.60.
- A 40 lb bag yields about 0.30 cubic feet, so 52.8 ÷ 0.30 = 176, which is 176 bags. At the example $4, that comparison is $704.00.
- A 60 lb bag yields about 0.45 cubic feet, so 52.8 ÷ 0.45 = 117.3333, which rounds up to 118 bags. At the example $5, that comparison is $590.00.
- An 80 lb bag yields about 0.60 cubic feet, so 52.8 ÷ 0.60 = 88, which is 88 bags. At the example $6.50, that comparison is $572.00. It is not added to the $807.00.
| Item | Example result |
|---|---|
| Total area | 144 sq ft |
| Volume before waste | 1.7778 yd³ |
| Volume after 10% waste | 1.9556 yd³ |
| Ordered yards at 0.25 | 2 yd³ |
| Ready-mix material at $150 | $300.00 |
| Delivery placeholder | $75.00 |
| Labor at $3 per sq ft | $432.00 |
| Total | $807.00 |
| Cost per square foot | $5.60 |
| 40 lb bags at $4 | 176 bags, $704.00 |
| 60 lb bags at $5 | 118 bags, $590.00 |
| 80 lb bags at $6.50 | 88 bags, $572.00 |
The button fills those entries and calculates. Change any number afterward, or choose Reset. Without a supplier increment, the same patio still orders 1.9556 cubic yards, and the bag counts stay 176, 118, and 88 because bags use the 52.8 cubic feet, not the rounded yard order.
An L made of that 12 by 12 foot patio plus an 8 by 6 foot rectangle, both at 4 inches, is 192 square feet and 2.3704 cubic yards before waste, or 2.6074 cubic yards after 10%. A 0.25 yard step orders 2.75 cubic yards. A 10 foot diameter circle at 4 inches and 10% waste is 1.0666 cubic yards before that same step rounds the order to 1.25. A 10 by 10 foot patio at 4 inches with 10% is 1.3580 cubic yards and matches the bag calculator: 123, 82, and 62 bags.
How thick is a residential concrete patio?
A common planning figure for a patio used by people and furniture is about 4 inches. That is why the thickness box starts at 4. Where a vehicle will drive onto the patio, a frequent planning range is about 5 to 6 inches, the same range the driveway calculator describes for heavier loads. This page does not assign a thickness. Soil, frost, and the local code can call for something else. Check the local code and a contractor before you order.
Thickness changes the volume. Six inches is 1.5 times a 4 inch patio of the same area, before waste. The 12 by 12 foot patio at 4 inches is 48 cubic feet before waste, or 1.7778 cubic yards. The same patio at 6 inches is 72 cubic feet before waste, or 2.9333 cubic yards after the 10% default. A second rectangle, if you enter one, uses the thickness you type for that section.
- About 4 inches: a frequent planning figure for a patio that carries people, furniture, and a grill, when that is the depth you already intend to use.
- About 5 to 6 inches: a frequent planning figure where a car, truck, or other vehicle will use the patio. It is still a range to confirm, not a size this calculator assigns.
- A plant will still ask for a strength, often in psi, and details such as slump. This page does not choose a psi. The bag label lists its own strength. Read the bag you buy.
What about slope, gravel, joints, and pavers?
A patio is often built with a slight slope so water drains away from the house. A common planning figure is about 1/8 inch of fall per foot. This page does not add that slope to the volume. Type the concrete thickness you plan to pour. If the slab is thicker at one edge, this total is the uniform thickness you entered, not a varying wedge.
A compacted gravel base is a common part of a patio. Measure the concrete thickness only. The gravel under it is not concrete, so it is not in the cubic yards. This page does not calculate tons of gravel or a base depth. Control joints are also common. This page does not design a joint layout, and it does not subtract joints or wire mesh from the volume. Pavers and flagstone are not poured concrete. Use this page for the concrete you pour, not for a count of pavers. The weight calculator can turn a volume you already have into pounds. It does not design the patio.
Should a patio be ready-mix or bags?
Ready-mix is sold by the cubic yard, plus any delivery or short-load fee you enter. Bags are sold by the bag, and someone has to mix them. The concrete volume is the same either way. Compare the two totals on this page with your own prices. Do not add them together.
In the 12 by 12 foot example, ready-mix material is $300.00 for 2 ordered yards, plus the $75.00 delivery placeholder. The 80 lb comparison is 88 bags and $572.00 at $6.50 a bag, before the time to mix them. Those dollar figures are placeholders. A local bag price or a higher short-load fee can change which one is lower. A patio under about 1 cubic yard is a common size to mix from bags. Above that, mixing bags is a long job.
One cubic yard is 27 cubic feet, or 45 of the 80 lb bags before waste, and 50 bags with the 10% default. The 12 by 12 foot patio at 4 inches is already 1.9556 cubic yards at 10% waste, which is why a short-load fee belongs in the comparison. The bag calculator notes the same 1 cubic yard point. The slab calculator shows the same yards for a plain rectangle.
What do people ask about a concrete patio?
How many yards of concrete does a patio need?
Cubic feet equal the measured area times thickness in feet. A rectangle is length times width. A circle is pi times the radius squared. A second rectangle, for an L-shape, is added the same way. Cubic yards are cubic feet divided by 27. The waste percent is added once to that total. A supplier increment, if you type one, rounds the ordered yards up.
How thick should a concrete patio be?
A common planning figure for a residential patio that carries foot traffic and patio furniture is about 4 inches. Where the patio will also hold a vehicle, a frequent planning range is about 5 to 6 inches. That is general guidance, not a building-code requirement, and it is not a thickness this page assigns. Soil, climate, and the load can change what the patio needs. Check the local code and a contractor before you order.
How do I measure an L-shaped patio?
Split the L into two rectangles that do not overlap. Enter one rectangle as the main patio and the other as the second section. Do not enter the shared corner in both sections. Leave the second section blank when the patio is one rectangle or one circle. If you fill any box in the second section, fill length, width, and thickness.
How much concrete is a 12 by 12 foot patio at 4 inches?
At 4 inches and 10% waste added once, a 12 foot by 12 foot patio is 144 square feet and 1.7778 cubic yards before waste. After 10% it is 1.9556 cubic yards. A 0.25 cubic yard supplier increment rounds that order up to 2 cubic yards. Bag counts from the cubic feet with allowance are 176 of the 40 lb bags, 118 of the 60 lb bags, and 88 of the 80 lb bags.
Is the waste percent added twice?
No. Base volume is the main patio plus any second rectangle you enter. Order volume equals that base times (1 + percent / 100). Ordered yards, bag counts, and the ready-mix material cost use that order volume. Labor uses the measured area and does not add the waste percent again. Blank waste keeps the 10% default. A blank thickness keeps 4 inches. Type 0 waste when you want no extra concrete.
Are the prices on this page a national average?
No. Every dollar amount is a number you type. The worked example uses placeholders such as $150 per cubic yard so the arithmetic is easy to follow. Replace them with a quote from a local plant, the delivery fee from that plant, and labor from the contractor you hire. This page does not look up prices.
What does this patio calculator leave to you?
It estimates quantity and the dollars from prices you type. Thickness, strength, reinforcement, joints, slope, and a code check stay with you or a qualified professional.
- Results are planning estimates. They are not a bid, a mix design, or a structural design.
- Every price is a number you enter. The worked example uses placeholders. They are not a national average and not a quote.
- The 4 inch and 5 to 6 inch notes are general guidance, not a code requirement and not a thickness this page assigns. Blank thickness keeps the 4 inch start value.
- Waste is 0 to 20 and is added once. Blank means the 10% default. Type 0 for no extra concrete. Labor does not use that percent.
- An L is two rectangles that do not overlap. This page does not detect a corner you entered twice, and it does not calculate a slope or a thickened edge.
- Bag yields are approximate published yields for one premixed product, in 40, 60, and 80 lb bags. They are not cement-only bags, and they are not every brand.
- Each side is limited to 10,000 feet. Prices are limited to $1,000,000. A supplier increment must be from 0.01 to 1,000 cubic yards.
- The ordered amount is not a promise that a plant will deliver that fraction of a yard or waive a short-load fee.
The disclaimer states the same limit for every calculator on this site.